| Project Title | Location | Client | Construction Period |
|---|---|---|---|
| Engineering, purchasing and supplying materials and equipment, manufacturing, installation and testing of spherical tanks for feed and product of PHD Petrochemical Unit of Kangan Polymer Development | Bushehr /
Bushehr Province | Kangan Polymer Development Company | 2025 ... |
| Raz Aftab Mine | Nehbandan / South Khorasan Province | Raz Aftab Kavir Shargh Mining and Industrial Company | 2024 ... |
| Project Title | Location of the Work | Client | Op.press u. (bar) | D.press u. (bar) | Construction Period |
|---|---|---|---|---|---|
| Piping of 8-inch gas transmission pipe connecting hot water gas produced at the South Pars Phase 13 refinery to the second site's hot waste heat using the EPC method | Bushehr Province | National Iranian
Gas Co.(N.I.G.C.) | 2025 ... | ||
| 56" Gas Pipeline from Miandoab to Ajabshir 90 KM (EPC) | Miandoab Ajabshir | National Iranian
Gas Co.(N.I.G.C.) | 90 | 96.5 | 2024-... |
| "Poldokhtar-kouhdasht,56" Gas trunkline(EPC)(103km)" | Lorestan | National Iranian Gas Co. (N.I.G.C.) | 72 | 96 | 2023 ... |
| Project Title | Location of the Work | Client | Construction Period |
|---|---|---|---|
| 78" Water Pipeline (100 Km.) | Isfahan province | Soffeh Water Company | 2024-... under construction |
| 78" Water Pipeline (54 Km.) | Isfahan province | Soffeh Water Company | 2024-... under construction |
| 78" Water Pipeline (65 Km.) | Isfahan province | Soffeh Water Company | 2024-... under construction |