42 Inch Gas Pipeline (Bidboland)

Khuzestan Provinces

August 05,2011
Back to Projects

42 Inch Gas Pipeline (Bidboland)

From Mandanizadeh To Bidboland Refinery(EPC) (21 Km.)

 

53- 2 Inch Gas Pipeline From Mandanizadeh To Bidboland- 01This project contract is EPC type and consisting of:

  • Engineering
  • Procurement
  • Construction

Stages.

 

 

 

 

 

Engineering:53- 2 Inch Gas Pipeline From Mandanizadeh To Bidboland- 02

This stage consisting of detail design, engineering, document generation according to International and Local codes.

Procurement:

Purchasing all Bulk Material such as pipe, mobile flare, valves, fittings, flanges, gaskets, bolt & nuts, paint, insulation, telecommunication equipment, instrumentation equipment, cathodic protection equipment and …

Construction:

Including construction of ROW, pipeline channel, access roads, pipe handling, bending, welding, NDT, joint insulation, back-filling, testing, commissioning, valve stations, pig launcher and receiver stations, river and road crossing and …

 

Location